System design & installation
Practical equipment and zoning proposals based on heat loads, room uses, controls, routes, access and the building programme.
Split, multi-split and VRF air conditioning for workplaces, hospitality venues and other commercial premises, with installation and ongoing support.

Commercial air conditioning should support comfort and operations without creating avoidable disruption. Occupancy, equipment heat, opening hours, zoning, controls, maintenance access and future changes all influence system choice.
Fusilair supports individual split systems, multi-split arrangements and larger VRF solutions. The design is matched to the building rather than forcing every site into the same equipment pattern.
Practical equipment and zoning proposals based on heat loads, room uses, controls, routes, access and the building programme.
Assessment of older or unsuitable equipment, including the condition of existing systems and the practical options for replacement.
Planned care and fault-finding to support performance, identify developing issues and keep records across one or multiple systems.
We discuss occupancy, room use, opening hours, comfort problems, equipment and any operational constraints.
Loads, zones, routes, controls, outdoor equipment, power, drainage and safe access are reviewed before the proposal.
Installation is coordinated around the site, followed by commissioning, handover and an appropriate maintenance plan.
The right solution depends on the real equipment, property and operating conditions. We confirm the scope after reviewing those details.
Different occupancies and heat loads may need independent temperatures, schedules or central oversight.
Pipe routes, drainage, electrical capacity, outdoor space, noise, access and appearance affect the design.
Opening hours, critical areas and service access help determine installation sequencing and ongoing care.
Read more practical guidance on our full frequently asked questions page.
Browse all FAQsA split system usually connects one or a small number of indoor units to outdoor equipment. VRF is designed for larger, multi-zone buildings and can connect many indoor units with centralised or individual control. Building size, diversity of use, controls and future flexibility determine which is more suitable.
Tell us your access restrictions and busiest periods when you enquire. We will discuss a practical programme and identify any work that requires shutdowns, restricted areas or coordination with other contractors.
Yes, if the system is designed with suitable zoning and controls. Split, multi-split and VRF options can provide independent control, but open-plan layouts, shared outdoor equipment and simultaneous heating or cooling requirements affect what is practical.
In England and Wales, systems with an effective rated output above 12 kW must be inspected by an accredited energy assessor at intervals no more than five years apart. Multiple units under the control of one person may count together. This statutory energy inspection is separate from routine maintenance.
Based in Westbury and working across Wiltshire, Somerset and nearby counties.